A sequence, not a wall of articles
Two guided paths, one for a first tech transfer and one for a first PPQ campaign. Each is four articles read in order, with a note on why that article comes where it does in the sequence. Not a course or a quiz, a reading order that builds the way the work actually unfolds.
Own your first tech transfer
Four articles, in sequence, that walk you from the ground up on tech transfer through owning a transfer to a CDMO: what to assess before you commit, how to keep technical ownership once someone else is running the process, and how deviations and change control work across that boundary afterward.
- Step 01
Technology Transfer for Advanced Therapies: How a Transfer Actually Gets Done
How to run a technology transfer for cell, gene, and RNA therapeutics: the document spine, phase-appropriate rigor, engineering runs, and the handoff criteria that make a transfer actually done.
Why it comes hereStart with the complete transfer sequence so you know every phase before you own a piece of one.
- Step 02
Technical Assessment of a CDMO Before You Sign
How to run the technical assessment, capability, capacity, culture, equipment fit, analytical readiness, and data systems, that turns CDMO selection into a defensible technical agreement instead of a leap of faith.
Why it comes hereBefore you commit a process to a receiving site, this is what you actually assess.
- Step 03
Person-in-Plant Oversight: What a PIP Is Actually For
Person-in-plant oversight at a CDMO: what to watch on the floor, virtual versus on-site models, and how to drive CAPA to closure without becoming the contractor's second QA unit.
Why it comes hereOnce the transfer is running, this is how you keep technical ownership of a process you do not operate day to day.
- Step 04
Deviations and Change Control Across a CDMO Network: Who Really Owns What
How to run deviations, root cause investigations, CAPA effectiveness verification, and change control across a network of contract manufacturers, from what the quality agreement actually buys you to the metrics that reveal a partner's quality system drifting.
Why it comes hereThe transfer is not done at PPQ. This is how deviations and change control get managed across the sponsor-CDMO boundary afterward.
Read each path in order. The articles build on each other: an engineering run strategy makes more sense once you have read the transfer article it feeds; a CPV program makes more sense once you understand what PPQ was actually trying to prove.
If you are not sure which path to start with, match it to what is on your desk this week rather than your title. A first-time tech lead running a PPQ campaign should still start with the PPQ path.
Both paths sit inside the full topic areas in Topics, and the ready-to-use protocols and forms that go with them are in the template library.