Naga MounikaDrug Product · Validation · CMC
Menu
Working document

ALCOA+ Data Integrity Risk Assessment Worksheet

A plug-and-play worksheet scoring a GxP system or record-keeping process against each ALCOA+ element, attributable, legible, contemporaneous, original, accurate, complete, consistent, enduring, and available, so a data integrity risk assessment states a specific basis for every element instead of a generic compliance assertion, with a filled specimen contrasting an electronic batch record system against a paper logbook.

Document typeRisk Assessment
Topic areaProcess Validation
LevelIntermediate
UpdatedOctober 2026
How to use this document

Copy the template below into your quality system. Replace every <<FILL: ...>> placeholder with your company, system, and process specifics, then route it through your own document control, review, and approval. The filled specimen shows one worked example; adapt the numbers and scope to your operation and verify each cited regulation or standard against the current source before you rely on it.

This is a generic, originally worded starting point. It contains no confidential, proprietary, or employer material, it is drafted with AI assistance and reviewed, it is not legal or compliance advice, and adopting it does not by itself create or prove compliance. See the Disclaimer and Terms.

This is a ready-to-use worksheet for assessing a GxP system, or a manual record-keeping process, against each of the nine ALCOA+ elements, so a data integrity risk assessment states a specific, checkable basis for every element rather than a single generic assertion that the system is “compliant.” Replace every <<FILL: ...>> placeholder with your own specifics and attach the completed worksheet to the system’s computerized system validation plan or, for a paper-based process, to the parent procedure. A filled specimen follows.

Document control header

FieldEntry
Document titleALCOA+ Data Integrity Risk Assessment for <<FILL: system or process name>>
Document number<<FILL>>
Version<<FILL>>
Assessment date<<FILL>>
System or process owner<<FILL>>
GxP-impact risk tier assigned by the parent VMP<<FILL: e.g. Tier 1>>
Linked VMP and risk classification matrix reference<<FILL>>

1. Purpose

This worksheet records, element by element, whether <<FILL: system or process name>> supports each ALCOA+ principle natively, through its own design and configuration, or depends on a manual or compensating control, and names that control. It exists so a data integrity risk assessment has a specific, auditable basis rather than a blanket statement that invites exactly the follow-up question an inspector is trained to ask: compliant according to what evidence.

2. Scope

Applies to <<FILL: system name and version, or the manual process name>>, used for <<FILL: intended GxP function, e.g. release testing data capture, batch record execution, environmental monitoring, manual logbook entries>>. Data integrity is not a separate risk tier; this worksheet is run at the depth the parent VMP’s risk tier for this system or process already calls for, heaviest for Tier 1, proportionate for Tier 2, and not required at all for a Tier 3 item the VMP’s own scoping test has already excluded.

3. Methodology

For each ALCOA+ element, state whether the system or process supports it natively, through its own design, access controls, or audit trail, or depends on a manual or compensating control, and name that control specifically. A blank or a one-word “yes” is not an acceptable entry; the basis column has to name the actual mechanism, a timestamped audit trail, an individually badged login, a second-person verification step, or whatever the real control is. An element with no native support and no named compensating control is a finding, not a pass.

4. ALCOA+ assessment table

#ElementNative support, manual control, or gapBasisFinding, if any
1Attributable, traceable to the specific person or system that generated it<<FILL>><<FILL>><<FILL>>
2Legible, readable and understandable for the full retention period<<FILL>><<FILL>><<FILL>>
3Contemporaneous, created at the time the activity happened<<FILL>><<FILL>><<FILL>>
4Original, the first recording or a true copy, not a transcription<<FILL>><<FILL>><<FILL>>
5Accurate, reflects what actually happened, with any correction visible<<FILL>><<FILL>><<FILL>>
6Complete, includes every result including a failing or out-of-specification one<<FILL>><<FILL>><<FILL>>
7Consistent, timestamps and sequence of events hold together internally<<FILL>><<FILL>><<FILL>>
8Enduring, will survive the full retention period including a system or media migration<<FILL>><<FILL>><<FILL>>
9Available, can actually be retrieved and reviewed on demand within the retention period<<FILL>><<FILL>><<FILL>>

5. Findings and remediation

Finding #Element affectedDescriptionOwnerDue date
<<FILL>><<FILL>><<FILL>><<FILL>><<FILL>>

An element with a finding is not closed by updating this worksheet alone; close it by implementing the control the finding identifies as missing, retesting, and recording the retest here.

6. Residual risk statement

<<FILL: state plainly whether, after remediation, every element is supported natively or by a named, implemented control, and whether any accepted residual risk remains, with the rationale for accepting it>>

7. Roles

RoleResponsibility
System or process ownerCompletes this worksheet, implements remediation for any finding
Validation leadConfirms the risk tier used in section 2 matches the parent VMP’s current risk classification
Quality AssuranceReviews and approves the completed worksheet, makes the final call on any accepted residual risk
Computerized systems owner, where applicableMaintains the technical controls, audit trail configuration, access control, this worksheet relies on as the native-support basis

8. References

FDA guidance, “Data Integrity and Compliance With Drug CGMP: Questions and Answers” (December 2018). MHRA, “GxP Data Integrity Guidance and Definitions,” revision 1 (March 2018). See the paired article, Validation Master Planning for a Clinical-Stage Biotech, for how ALCOA+ connects to the VMP’s own GxP-impact risk tiers.

Confirm the current version of each reference before issue.

9. Revision history

VersionDateAuthorSummary of change
<<FILL: 1.0>><<FILL>><<FILL>>Initial issue.

10. Approvals

RoleNameSignatureDate
Author (System or process owner)<<FILL>>
Reviewer (Validation)<<FILL>>
Approver (Quality Assurance)<<FILL>>

Filled specimen

Two contrasting assessments from an illustrative clinical-stage biologics program: an electronic batch record system, Tier 1, and the paper logbook it replaced in one suite still transitioning off paper.

Electronic batch record system, Tier 1

#ElementSupportBasisFinding
1AttributableNativeIndividual badge login required; shared credentials disabled at system configurationNone
2LegibleNativeData stored in the system’s own database, rendered on screen and in PDF export, no print-only or thermal media involvedNone
3ContemporaneousNativeEach step time-stamped by the system at the moment of entry, not editable after the factNone
4OriginalNativeSystem is the point of first entry; no transcription step exists in the workflowNone
5AccurateNativeCorrections require a documented reason code and preserve the original entry in the audit trailNone
6CompleteManual controlProcedure requires the operator to record an out-of-range reading and route it to a deviation, rather than the system blocking entry of an unfavorable resultAudit trail review confirmed no suppressed entries in the sampled period; control effective
7ConsistentNativeSystem sequence logic blocks a review step from being signed before the preceding execution step is completeNone
8EnduringManual controlVendor-committed data migration plan exists for the system’s next major version, not yet executedOpen finding: migration plan execution tracked as a program gap, not closed by this worksheet alone
9AvailableNativeAudit trail export function tested and demonstrated to Quality Assurance during this assessmentNone

Paper logbook, same manufacturing suite, Tier 2 interim process pending full electronic conversion

#ElementSupportBasisFinding
1AttributableManual controlProcedure requires each entry to be initialed, with an initials-to-name key maintained separatelyNone, control effective and verified during this assessment
6CompleteGapNo reconciliation step confirms no page of the bound logbook is missing before archivingFinding: add a page-count reconciliation step to the archiving procedure, owner Quality Assurance, due before the next periodic review

Residual risk statement: the electronic batch record system is accepted with one open finding, the vendor migration plan, tracked to closure outside this worksheet. The paper logbook carries one accepted finding pending the reconciliation step described above; no other residual risk is accepted for either record-keeping method.

Common findings this worksheet prevents

  • A data integrity risk assessment that states a system is “ALCOA+ compliant” with no element-by-element basis, so a later reviewer cannot tell which elements were actually checked.
  • A vendor’s own platform-level testing evidence cited as the basis for every element, when the vendor’s testing speaks to the platform’s design, not to how this site’s specific configuration and use pattern actually produces records in practice.
  • A manual compensating control named in the narrative but never verified as actually working, rather than tested and recorded as this worksheet requires.
  • The “complete” element assessed only for whether passing results are captured, with no check for whether a failing or out-of-specification result could be excluded from the dataset undetected.

How to adapt this worksheet

  1. Run this worksheet at the depth the parent VMP’s risk tier for this system or process already calls for; do not run full element-by-element rigor on a Tier 3 item the VMP has already excluded from formal validation scope.
  2. Name the actual mechanism behind every “native support” or “manual control” entry; a basis column with no named mechanism is not a completed assessment.
  3. Treat any gap as a finding with an owner and a due date, not a narrative caveat buried in the assessment’s prose.
  4. Re-run this worksheet when the system is upgraded to a new major version, when a manual process it covers changes, or on the parent VMP’s periodic review cycle.
Add this site to your home screen Full screen, works offline, one tap from your home screen.