Naga MounikaDrug Product · Validation · CMC
Menu
Working document

CDMO Reference Call Interview Guide

A plug-and-play work instruction for conducting an independently-arranged CDMO reference call: task-level steps, a structured question set across capability, capacity, and culture, per-question acceptance guidance, and a filled specimen.

Document typeWork Instruction
Topic areaCDMO Governance
LevelIntermediate
UpdatedSeptember 2026
How to use this document

Copy the template below into your quality system. Replace every <<FILL: ...>> placeholder with your company, system, and process specifics, then route it through your own document control, review, and approval. The filled specimen shows one worked example; adapt the numbers and scope to your operation and verify each cited regulation or standard against the current source before you rely on it.

This is a generic, originally worded starting point. It contains no confidential, proprietary, or employer material, it is drafted with AI assistance and reviewed, it is not legal or compliance advice, and adopting it does not by itself create or prove compliance. See the Disclaimer and Terms.

This is a ready-to-use work instruction for conducting a CDMO reference call as part of the technical assessment. It is a task-level companion to the CDMO Technical Due Diligence Plan: that plan scopes the whole assessment, this instruction governs the single task of running one reference call well. Replace every <<FILL: ...>> placeholder. A filled specimen follows.

Purpose and parent document

This work instruction supports Step <<FILL: reference to the due diligence plan's step number>> of the CDMO Technical Due Diligence Plan. It exists because a reference call arranged entirely by the CDMO tends to produce only the story the CDMO chose to tell; this instruction is written for a reference contact reached independently, through a professional network, a prior colleague, or a public case study, not one supplied by the CDMO’s sales team.

Before the call

  1. Confirm the reference was reached independently of the CDMO’s introduction. If the CDMO supplied every reference contact on the list, note this as a red flag per the technical assessment’s red flag table and continue seeking an independent contact rather than treating the CDMO-supplied list as sufficient.
  2. Confirm the reference’s program at this CDMO is comparable in modality, scale, or complexity to the program under assessment; a reference for a small-molecule oral solid program says little about a first-in-class cell therapy campaign at the same site.
  3. Send the reference a short list of topics in advance, not the full question set, so the call stays conversational rather than an interrogation read off a script.

During the call: structured question set

#QuestionWhat a strong answer sounds likeWhat a weak or evasive answer sounds like
1Tell me about a time something went wrong on your program. How did the site handle it?A specific, named event with a clear account of how it was escalated, investigated, and resolvedA vague assurance that “everything went smoothly,” with no specific event offered
2How quickly does the site escalate a deviation or a schedule risk to you, versus waiting for you to ask?Proactive escalation, named examples of the site raising bad news firstReactive: problems surface only when the sponsor asks directly
3Has the site ever pushed back on an unrealistic request from your team? What happened?A specific example where technical or quality staff, not just business development, said no or flagged a real constraintNo example, or an answer suggesting the site agrees to everything asked
4How has your key technical contact’s tenure and continuity been over the program?Stable technical contacts across the program’s life, or a documented, well-managed handoffFrequent turnover with no visible knowledge-transfer process
5If you were starting this program again, would you choose this site? Why or why not?A specific, reasoned answer, including named tradeoffs, either wayA generic “yes, they’re great” with nothing behind it
6How did the site perform against its committed timeline, and how did it communicate a slip if one happened?A specific account of an actual timeline, hit or missed, and how communication worked either wayNo specifics, or defensiveness about the question
7What would you tell a colleague to watch out for at this site?A specific caution the sponsor can actually use, even a minor one”Nothing really,” offered without hesitation on a multi-year manufacturing relationship

After the call

  1. Record the reference’s answers against the disposition register alongside the rest of the technical assessment’s findings, not in a separate, informal note that never reaches the record.
  2. Where the reference surfaces a specific concern, route it to Quality Assurance or the executive sponsor for a documented risk acceptance or further diligence, per the technical assessment’s normal disposition process; do not let a reference-call finding disappear because it arrived informally.
  3. Weigh a reference call’s culture-related findings, question 2 and question 3 above especially, as seriously as a capability finding; culture is the hardest of the three assessment dimensions to observe directly and a candid reference call is one of the few ways to get at it before signing.

Filled specimen

Extract from Acme Therapeutics’ reference call for Meridian Fill Services, reached independently through a technical operations contact at a prior employer, not supplied by Meridian’s sales team.

QuestionReference’s answer
Something going wrongDescribed a 2025 stopper-seal deviation on their own program; Meridian’s floor quality lead escalated within the shift, root cause traced to a torque setting drift, corrective action verified across the next three batches
Proactive escalationConfirmed Meridian’s technical contact flagged a raw-material lead-time risk six weeks before it would have affected the schedule, without being asked
Pushback on an unrealistic requestMeridian’s process engineer declined a request to compress an engineering run timeline, citing insufficient time to bracket shelf temperature at full load; the reference’s own team agreed in hindsight the pushback was correct
Would choose againYes, specifically citing consistent technical contact continuity across a three-year program

Disposition: no red flag raised; culture assessment scored favorably, corroborating the technical assessment’s other findings rather than contradicting them.

Common findings this instruction prevents

  • Every reference contact supplied by the CDMO, producing a uniformly positive picture that never gets independently tested.
  • A reference call that happens but is never recorded against the assessment’s actual findings record.
  • A culture-relevant concern raised informally on a reference call that never reaches Quality Assurance for a documented disposition.
  • A reference call run against a program that is not actually comparable to the one under assessment, producing false reassurance.

How to adapt this instruction

  1. Adjust the question set to the specific modality and risk profile of your program.
  2. Confirm your own technical assessment’s disposition register is the actual destination for reference-call findings, not a side note.
  3. Set your own standard for how many independently-reached references are required before the assessment is considered complete.
Add this site to your home screen Full screen, works offline, one tap from your home screen.