How to use this document
Copy the template below into your quality system. Replace every <<FILL: ...>> placeholder with your company, system, and process specifics, then route it through your own document control, review, and approval. The filled specimen shows one worked example; adapt the numbers and scope to your operation and verify each cited regulation or standard against the current source before you rely on it.
This is a generic, originally worded starting point. It contains no confidential, proprietary, or employer material, it is drafted with AI assistance and reviewed, it is not legal or compliance advice, and adopting it does not by itself create or prove compliance. See the Disclaimer and Terms.
This is a ready-to-use risk assessment for evaluating, at every process, formulation, or filter change, whether the existing sterilizing filter validation package still applies. Attach it to the relevant change control record. Replace every <<FILL: ...>> placeholder with your own specifics and route it through your normal document control, review, and approval. A worked filled specimen follows. Verify each cited reference against the current source before you rely on it.
1. Purpose
This assessment determines whether a proposed process, formulation, or filter-manufacturer change invalidates any part of the existing sterilizing filter validation package, either the bacterial retention claim, the integrity test correlation, the bracketing rationale, or the extractables and leachables conclusion, and defines the action required before the change is implemented.
2. Scope
3. Responsibilities
4. Change classification
Classify the change against the categories below. More than one row applicable increases the scope of follow-up work required.
5. Impact evaluation
6. Conclusion and required action
7. References
ASTM F838, Standard Test Method for Determining Bacterial Retention of Membrane Filters Utilized for Liquid Filtration.
PDA Technical Report No. 26, Sterilizing Filtration of Liquids.
Internal quality agreement with the filter manufacturer, change notification clause.
Confirm the current version of each reference before issue.
8. Revision history
9. Approvals
Filled specimen
Extract for an example change control proposing to increase a biologic drug product’s maximum filtration time from 4 to 8 hours to accommodate a larger commercial batch size. Company and product are illustrative.
Impact evaluation: the original bacterial retention study challenged a 4-hour maximum filtration time; an 8-hour run sits outside that validated worst case, and prolonged product-membrane contact time is itself a variable ASTM F838 studies are designed to bound. Conclusion: existing validation package does not cover the proposed 8-hour filtration time. Required action: request an extended bacterial retention study from the filter manufacturer at the new 8-hour worst-case parameter set, with the bacteriostasis screen re-confirmed at the longer contact time. Owner: Filter Validation Lead, target date set to precede the change control’s planned implementation date. The change cannot proceed to commercial batches until the extended study report is issued and approved; QA holds the change control open pending that report.
Common inspection findings this risk assessment prevents
- A process parameter change implemented through change control with no linked review of the filter validation package it affects.
- A filter manufacturer’s change notification received and filed with no sponsor-level impact assessment performed against it.
- A revalidation impact assessment performed after the change is already running in commercial manufacture rather than before.
- A conclusion of “no impact” reached with no documented comparison against the original validated worst-case parameters.
How to adapt this risk assessment
- Link this assessment to the actual change control record in the header, not as a standalone document.
- Classify the change honestly against every row in section 4; more than one applicable row is common and each one needs its own impact evaluation.
- State plainly in section 6 whether the change can proceed before the required action closes, and get QA’s explicit position on record either way.
- Confirm every reference in section 7 against the current published version before issue.