How to use this document
Copy the template below into your quality system. Replace every <<FILL: ...>> placeholder with your company, system, and process specifics, then route it through your own document control, review, and approval. The filled specimen shows one worked example; adapt the numbers and scope to your operation and verify each cited regulation or standard against the current source before you rely on it.
This is a generic, originally worded starting point. It contains no confidential, proprietary, or employer material, it is drafted with AI assistance and reviewed, it is not legal or compliance advice, and adopting it does not by itself create or prove compliance. See the Disclaimer and Terms.
This is a ready-to-use plan for a person-in-plant (PIP) program covering a specific CDMO relationship or campaign. Replace every <<FILL: ...>> placeholder, confirm the plan’s authority traces to the governing quality or technical agreement, and route it through document control before the campaign starts. A filled specimen follows.
1. Purpose
This plan defines the scope, oversight model, roles, and escalation channel for sponsor person-in-plant presence during <<FILL: campaign / product / unit operation>> manufacturing at <<FILL: CDMO name>>, consistent with the authority granted under the governing agreement referenced above.
2. Scope
3. Oversight model selection
State the model selected for this specific campaign and the risk basis, referencing the rows above rather than restating the logic each time.
4. Roles and responsibilities
5. Escalation channel
6. Reporting
The PIP issues a report per visit or per defined interval using the paired PIP Visit / Trip Report template, distributed to sponsor technical operations and quality leadership and, in a form the CDMO can act on, back to the site.
7. Acceptance criteria for the program
This oversight program is considered functioning as intended when every escalation in Section 5 reaches a named owner and due date in a real tracking system, every report reaches both sponsor leadership and the site, and no verbal commitment from CDMO staff goes untracked past the visit in which it was made.
8. References
21 CFR 211.22, Responsibilities of quality control unit.
FDA guidance, “Contract Manufacturing Arrangements for Drugs: Quality Agreements” (November 2016).
ICH Q10, Pharmaceutical Quality System, Section 2.7, Management of Outsourced Activities and Purchased Materials.
9. Revision history
10. Approvals
Filled specimen
Acme Therapeutics, autologous CAR-T fill campaign at Meridian Fill Services, third campaign at this CDMO.
Common inspection findings this plan prevents
- A PIP program with no documented basis in the governing quality or technical agreement.
- An oversight model applied uniformly regardless of site maturity or product risk, with no recorded rationale for the level chosen.
- Escalations that happened verbally with no channel or owner defined in advance.
How to adapt this plan
- Confirm the governing agreement referenced in the header actually grants the access this plan assumes; add the language if it is missing before the campaign starts.
- Select the oversight model in Section 3 from the actual risk situation, not the model used last time by default.
- Name real roles, not placeholders, in Sections 4 and 5 before the campaign begins.